Requirement Gathering Establish the type of study required Recommendation on Current & Future Technology Trend Presentation of Conceptual Schematics Finalization of the Conceptual Schematics

Preparation of Detail Schematic Designs Presentation of Detail Schematics Finalization of Detail Schematics Preparation of Initial Budget Estimates Preparation of Tender Specifications

Preparation of Tender Drawings & Specifications for Issue Bid Submissions Review & Recommendations Bidder Interview (with Client) Submission of Final Recommendations for Award Preparation of Contracts Between Client and Contractor(s)

Review and Comment on Shop Drawings and Equipments Submitted by the Awarded Contractor Periodic Site Inspections on the Installation Works and Provide Comments / Suggestions to S.O / Contractor Witness Testing & Commissioning Conducted by the Contractor On Site Attend Client / Consultant and Contractors Meeting

Attend Defect Meeting (if required) During Warranty Period. Duration of works will be within approximately 24 months.